"I-395/Route 9 Hard Look"
The ASCE reported (December 2020) an annual $68 million shortfall in the state’s bridges program and an annual shortfall of $165 million in the roads program before whatever damage the pandemic has inflicted with the loss of highway fund revenues and whatever the DOT has already spent from the bond money set aside for the 2021 season. We have no money, yet this $104 million boondoggle continues…
Skip to content
  • Home
  • Facts
    • Letter to the OIG
    • Substantive 2B-2 Facts
    • 2013 FOAA (GH)
    • LD47 Testimony (LA)
    • LD47 Testimony (GH)
    • STIP Comments (GH)
    • STIP Comments (LA)
    • BACTS Testimony (LA)
    • BACTS Testimony (SB)
    • Brewer Boondoggle
    • History was dismissed…
    • We have no money…
    • LD783 Testimony (LS)
    • LD783 Testimony (LA)
    • A viable solution
    • Ides of March 2020
    • What’s the real cost?
    • Virtual Meeting Aug. 2020
  • Issues
    • Unmet Purpose & Needs
    • Safety Concerns
    • Change in Route Design
    • Wasted Taxpayer $$
    • Maine’s Unmet Needs
  • Ancillary
    • “Biweekly” DOT Updates
    • Voices of Reason
    • FOAA Discovery
    • Unanswered Questions
    • Important Documents
    • PAC Meetings
  • Maps
    • GIS Data
    • Preliminary Drawings
    • Partial C/L Alignment
    • Official maps – 6.27.2018
  • Media
    • Newspapers
    • Letters to the Editor
    • Broadcast Media
    • The early years in the BDN
  • Newsletters
  • Years
    • 2015 News
    • 2016 News
    • 2017 News
    • 2018 News
    • 2019 News
    • 2020 News
    • 2021 News

Official maps – 6.27.2018

 

Click here to view Map #1 starting at the I-395 interchange to Lambert Road.

 

Click here to view Map #2 from Lambert Road to the Route 9 connecting point.

 

  • header image text

  • separator

  • veteran owned

    veteran owned
  • separator

  • Archie

  • no 2B-2

  • Loss of gas tax revenues

  • Loss of gas revunues over 18 months

  • No 2B-2

  • Van Note says: Too damn close.

  • no 2B-2

  • Steve on Channel 7

  • no 2b2

  • BACTS Bost

  • no 2B-2

  • Pinochio

  • Van Note – system will suffer

  • Pinochio

  • Chief Engineer

  • no 2B-2

  • Wiscasset Bypass

  • No 2B-2

  • East of Route 46

  • no 2b2

    no 2b2
  • funding system is broken

    funding system is broken
  • no 2b2

    no 2b2
  • 16 percent more

    16 percent more
  • no 2b2

    no 2b2
  • TRIP statistics

    TRIP statistics
  • no 2B-2

  • VanNote aug 2019 rev1

    VanNote aug 2019 rev1
  • no 2b2

    no 2b2
  • Bonds

    Bonds
  • no 2b2

    no 2b2
  • losing ground

    losing ground
  • no 2b2

    no 2b2
  • boondoggle

    boondoggle
  • no 2b2

    no 2b2
  • struggling

  • no 2B-2

  • more miles makes no sense

  • no 2B-2

  • no new infrastructure

  • no 2B-2

  • Search

  • thanks to Gretchen

    thanks to Gretchen
  • SSL

  • copyright

    copyright
"I-395/Route 9 Hard Look"
Proudly powered by WordPress.