"I-395/Route 9 Hard Look"
Mr. Van Note suggests an annual $232 million unmet transportation need, as briefed by DOT officials to the Blue Ribbon Commission in October 2019, is “generally consistent” with annual shortfalls in the 2021 DOT work plan as the DOT appears to be unable –OR– refuses to update that pre-pandemic shortfall the DOT identified 15 months ago. We have no money, yet this $104 million boondoggle continues…
Skip to content
  • Home
  • Facts
    • Letter to the OIG
    • Substantive 2B-2 Facts
    • 2013 FOAA (GH)
    • LD47 Testimony (LA)
    • LD47 Testimony (GH)
    • STIP Comments (GH)
    • STIP Comments (LA)
    • BACTS Testimony (LA)
    • BACTS Testimony (SB)
    • Brewer Boondoggle
    • History was dismissed…
    • We have no money…
    • LD783 Testimony (LS)
    • LD783 Testimony (LA)
    • A viable solution
    • Ides of March 2020
    • What’s the real cost?
    • Virtual Meeting Aug. 2020
  • Issues
    • Unmet Purpose & Needs
    • Safety Concerns
    • Change in Route Design
    • Wasted Taxpayer $$
    • Maine’s Unmet Needs
  • Ancillary
    • “Biweekly” DOT Updates
    • Voices of Reason
    • FOAA Discovery
    • Unanswered Questions
    • Important Documents
    • PAC Meetings
  • Maps
    • GIS Data
    • Preliminary Drawings
    • Partial C/L Alignment
    • Official maps – 6.27.2018
  • Media
    • Newspapers
    • Letters to the Editor
    • Broadcast Media
    • The early years in the BDN
  • Newsletters
  • Years
    • 2015 News
    • 2016 News
    • 2017 News
    • 2018 News
    • 2019 News
    • 2020 News
    • 2021 News

2013 FOAA (GH)

Click here for Gretchen’s FOAA Evaluation.

  • header image text

  • separator

  • veteran owned

    veteran owned
  • separator

  • Archie

  • no 2B-2

  • Loss of gas tax revenues

  • Loss of gas revunues over 18 months

  • No 2B-2

  • Van Note says: Too damn close.

  • no 2B-2

  • Steve on Channel 7

  • no 2b2

  • BACTS Bost

  • no 2B-2

  • Pinochio

  • Van Note – system will suffer

  • Pinochio

  • Chief Engineer

  • no 2B-2

  • Wiscasset Bypass

  • No 2B-2

  • East of Route 46

  • no 2b2

    no 2b2
  • funding system is broken

    funding system is broken
  • no 2b2

    no 2b2
  • 16 percent more

    16 percent more
  • no 2b2

    no 2b2
  • TRIP statistics

    TRIP statistics
  • no 2B-2

  • VanNote aug 2019 rev1

    VanNote aug 2019 rev1
  • no 2b2

    no 2b2
  • Bonds

    Bonds
  • no 2b2

    no 2b2
  • losing ground

    losing ground
  • no 2b2

    no 2b2
  • boondoggle

    boondoggle
  • no 2b2

    no 2b2
  • struggling

  • no 2B-2

  • more miles makes no sense

  • no 2B-2

  • no new infrastructure

  • no 2B-2

  • Search

  • thanks to Gretchen

    thanks to Gretchen
  • SSL

  • copyright

    copyright
"I-395/Route 9 Hard Look"
Proudly powered by WordPress.